The following videos complement our module exchange service. Each video details the procedure of replacing a particular console assembly enabling you to replace a defective part with confidence.

Important notice:

Before attempting this procedure, please familiarise yourself with the instructions in full to ensure that you have sufficient time and technical skills to complete the procedure. If you would prefer an SSL engineer to perform the procedure, please contact your local SSL distributor office.

These instructions are intended for technically competent personnel. To reduce the risk of electric shock, do not perform the procedure unless you are competent to do so.

Electrostatic discharge (ESD)can damage electrical components, even if you cannot feel, see or hear it. Before starting work, grasp an exposed metal part of the console chassis with your bare hand to ground any static charge which you may have accumulated.

Switch off and disconnect the mains supply before removing any panels or modules.

Large capacitors such as those used in power supplies can continue to store dangerous voltages even if the console has been disconnected from the mains. To reduce the risk of electric shock, allow up to 20 minutes for capictors to discharge after isolating the mains supply before starting work on any high voltage modules.

When using solvents, wear suitable eye protection at all times. Ensure adequate ventilation to prevent buildup of vapour and work well away from possible sources of ignition.

Jay Rigby, Front of House Engineer, Queens of the Stone Age

Jay Rigby has chosen the SSL L500 console for Front of House duties on the recent Queens of the Stone Age world tour, supplied by Eighth Day Sound. In this interview, at the Eden Sessions UK, he talks about his creative approach to the QOTSA signature sound, dealing with mid-range madness, working with a 'variable' set-list, and the role the L500 console plays in everything.

Recent Videos